|
| |
Center Manufacturing Byron
Center, Michigan
Download PDF |
|
data |
|
 |
•
new and renovated
office space
•
construction
completed: 1997
•
building area: 11,590 s.f.
addition and renovation
•
delivery
method:
design-build
•
general contractor: DVK Construction, Inc.
•
cost: $550,000 / $47 per s.f.
DVK Construction, Inc
website
 |
|
|
before |
|
after |
|
summary |
|

Photos by:
Stephen Graham
|
|
Center Manufacturing required additional office space for their
manufacturing plant. The small and disjointed existing office spaces from
several previous additions did not allow the teams to work well together.
The design solution expanded the offices and reorganized the existing spaces
into a cohesive plan. The addition creates a new unified image for the
building, while the lobby and entry communicate the client's desire to
express the precision and strength of metal.
|
|
|